Updating a Strata 10-Year Plan After Major Works or New Defects in Perth

||6 min read
Share
Architect reviewing building plans beside a modern Perth apartment complex in bright daylight.

Buying Your Dream Home or Building A House?

Don't let hidden issues ruin your dream home. Whether you are buying an established property in Perth or building from the ground up, our thorough inspections give you the total peace of mind you deserve.

Book An Inspection

Keep Your Strata 10-Year Plan Working After Big Changes

A big project has just wrapped up in your complex. Maybe the facade has been repaired, the roof replaced, or the carpark finally fixed so it stops flooding. Everyone breathes out in relief; the scaffolding comes down, and then the question pops up: what happens to the existing strata 10-year plan in Perth?

This is where many schemes get stuck. A 10-year plan is not a one-off report to file away. It is a living document that should change as your building changes. When major works are finished or new defects appear, the plan needs to shift as well, or you risk underfunded levies, last-minute special levies, poor timing of works and, over time, lower property appeal.

At ABBC Building Inspectors, we work with Perth strata councils and managers to reset plans after real-world events. Below, we walk through when an update is triggered, what information to gather, how to re-prioritise works, how to reset funding, and how to record everything properly before AGM season sneaks up again.

Know When Your 10-Year Plan Must Be Updated

Some events should prompt an automatic review of your strata 10-year plan in Perth. If one of these happens, it is a sign your plan is now out of date.

Common triggers include:

  • Completion of major capital works like roof replacement, facade or cladding repairs, balcony remediation or lift upgrades
  • Discovery of new defects such as water ingress, structural cracking or concrete spalling
  • Changes to regulations, fire safety requirements or insurance conditions that affect building elements

Perth's seasons also reveal different issues. After winter rain, you might see:

  • Roof leaks or gutter failures
  • Damp patches inside units
  • Ponding in carparks or on podium slabs

After long periods of strong sun, new problems can appear, such as:

  • Movement cracks
  • UV damage to membranes, sealants or paint
  • Degradation of external finishes

Not every repair means you must reset the whole plan. Small reactive fixes, like replacing a few broken tiles or patching a small leak, may only need a brief note. But if:

  • The works are large in cost or area, or
  • The building's overall condition has clearly shifted

Then it is time for a fresh inspection and an updated 10-year view, even though it may not be 10-years since the last plan.

The council of owners and the strata manager have a duty to act on new information, not just file it away. A plan that ignores recent works or fresh defects is hard to defend if things go wrong later.

Gather the Right Evidence Before You Rewrite the Plan

Before anyone starts changing dates and costs in the plan, it helps to get a clear picture of where the building stands right now.

That means pulling together:

  • Recent invoices and completion statements for major works
  • Certificates of practical completion and compliance documents
  • Warranties for products and systems
  • Defect reports, emails and photos from contractors or owners

We often recommend an independent post-works inspection. This type of inspection:

  • Confirms what has actually been fixed
  • Checks workmanship at a building level
  • Picks up any related or newly visible defects that the big project has revealed

For example, once scaffolding comes down, you might notice staining on the facade, cracks in adjoining areas or new leaks in internal units. After heavy storms, owners may report:

  • Internal ceiling or wall leaks
  • Water ponding in a carpark
  • Efflorescence or rust staining on external walls

These should not be treated as isolated lot problems only. They may point to wider building issues that belong in the strata 10-year plan in Perth.

Our strata inspections focus on completed buildings, not works in progress. The goal is to understand current condition and plan future maintenance, rather than supervise trades during construction.

Re-Prioritise Works and Timing Across the 10 Years

Once you know what has changed, the next step is to reshuffle the program of works.

Major completed projects will usually:

  • Push some big items further out, because they are now new or near-new
  • Introduce new tasks, such as warranty inspections or planned mid-life servicing
  • Change the order of related works, like repainting after facade repairs

For example, if you have a new roof, the plan should:

  • Remove or delay previous replacement allowances
  • Add scheduled inspections during the warranty period
  • Include future maintenance like cleaning, minor flashing repairs and sealant checks

On the other side, new defects can pull some works forward. Serious items might include:

  • Facade remediation moving ahead of general repainting
  • Structural cracking and painting being addressed before landscaping upgrades
  • Water ingress repairs taking priority over cosmetic items in lobbies

When we help re-prioritise, we usually weigh:

  • Safety and structural integrity
  • Compliance and water ingress control
  • Access and usability of common areas
  • Appearance and general amenity

The plan should clearly show that life safety and building performance come first, with cosmetic work following once higher risks are controlled.

In Perth's climate, timing also matters. Roof and external envelope works are best planned so they are complete before the wetter months, and heat-sensitive jobs like some membranes or sealants are better timed outside of peak summer where possible.

Reset Your Funding Model to Match the New Reality

Updating the program of works is only half the job. The money side has to line up with the new picture.

Start by comparing the current reserve fund projections with the updated schedule. Common problems when plans are not updated include:

  • Levies still based on old work scopes that no longer exist
  • No allowance for new defects or fresh projects
  • Lumpy funding that almost guarantees future special levies

A good review will:

  • Spread upcoming costs more evenly across the 10-year period
  • Use realistic cost escalations for labour and materials in the Perth market
  • Reflect the real timing of major works, not wishful thinking

Independent cost estimates from people who inspect local buildings every day add real value here. That way, the strata 10-year plan in Perth is built on current construction and remediation costs, not on rough allowances pulled from old documents.

Funding assumptions should also be clearly tied back to:

  • The updated condition assessment
  • The revised works schedule
  • Any known warranties or expected service lives

This transparency gives owners more confidence during levy approvals at the AGM and reduces arguments about why money is being raised.

Document, Communicate, and Act on Your Updated Plan

A good update is more than a set of changed dates. It should read clearly and tell the story of what has happened and what is planned next.

A well-documented update usually includes:

  • A revised 10-year schedule of works
  • Updated condition commentary for key building elements
  • Refreshed cost estimates and funding assumptions
  • A clear record of completed projects, dates and warranties

Once the update is ready, it should go to the council of owners and then be tabled at the AGM. When presenting it, it helps to explain:

  • What has changed in the building since the last version
  • How that has affected priorities and timing
  • What the funding impact is for owners

Open communication makes a big difference. Owners are more likely to support levies when they see that:

  • Independent registered builders have inspected the building
  • Decisions are based on real evidence, not guesswork
  • Safety and long-term condition are being taken seriously

From there, it is about rhythm. Many schemes benefit from a light check each year, plus a deeper review every few years or after any major project. With this kind of regular attention, your strata 10-year plan in Perth stays accurate, your building stays in better shape and those nasty surprise levies are far less likely to appear.

Plan Your Strata's Future With Confidence Today

If you are ready to protect your building and avoid costly surprises, we can help you put a clear and practical strata 10-year plan in Perth in place. At ABBC Building Inspectors, we work closely with your strata council to identify priorities, budget accurately and schedule maintenance before problems escalate. Reach out to our team to discuss your complex and we will tailor a solution that suits your property and owners. If you would like to talk through your options or request a quote, simply contact us today.

Frequently Asked Questions

When should a strata 10-year plan be updated in Perth?

A strata 10-year plan should be reviewed after major capital works, newly discovered building defects, or changes to fire safety, insurance or regulatory requirements. It should also be updated when the building's condition or expected maintenance costs have materially changed.

Do major roof, facade or carpark repairs need to be added to a strata 10-year plan?

Yes, major completed works should be recorded in the plan, including their cost, completion date, warranties and expected service life. This helps remove completed items from future budgets and schedule the next maintenance or replacement cycle accurately.

What is the difference between a small repair and a defect that requires updating the 10-year plan?

Small reactive repairs, such as replacing a few tiles or fixing a minor isolated leak, may only need to be noted in maintenance records. Defects affecting a larger area, involving significant cost, or indicating wider issues such as water ingress, concrete spalling or structural cracking should trigger a plan review.

How do I update a strata 10-year plan after major works are completed?

Gather invoices, completion certificates, warranties, photos and defect reports, then arrange an inspection to confirm the building's current condition. The plan can then be revised by removing completed works, reprioritising remaining projects, adding new defects and resetting projected costs and funding needs.

Why is an updated strata 10-year plan important for levies?

An up-to-date plan helps the strata company set realistic reserve fund contributions and spread major costs over time. Without an update, owners may face underfunded budgets, poorly timed projects or unexpected special levies.